We use cookies to help improve our website and personalise your experience. To find out more about how to manage these cookies, please see our cookie policy.
We have been selected by Tadmur Trading, a repeat business customer for BES, to support them with the provision of cleanroom consultation and design services for a project at the prestigious hi-tech Sidra Hospital in Doha, Qatar. The scope of work involves the remodelling of the existing facilities in order to produce three new validated research and support areas. These new cleanrooms will be designed to the highest standards, complying with US Pharmacopeia 797 guide.
We are pleased to report the successful completion of the fast track refurbishment of an existing 2,200m2 laboratory and office for a Blue Chip customer at Chesterford Science Park. The upgraded facility will be used as a temporary home for the relocation of approximately 150 scientists to Cambridge, pending the completion of their new facility, and therefore the project had to be completed at record pace to ensure that medicines can continue to be developed during this transition phase.
BES have recently completed a full turnkey project for a leading provider of renal products and services. We carried out the design, construction, commissioning and validation of a new Grade B Cleanroom and the refurbishment of existing corridors and manufacturing suites used for the production of intravenous therapies.
​On two recent BES projects facility Mock-ups have been used during the concept and detailed design to help the client better understand the facilities egronomics and finishes. The ergonomic one was constructed with door opening and vision panel locations and included full scale representations of the equipment to be installed within the facility, for example Class 2 cabinets, and freeze dryers.
BES are carrying out the internal fit out of a new £120m sterile production facility in partnership with AstraZeneca. The three storey building houses state of the art production equipment and is finished to the most exacting standards. Our scope of work encompasses the Design, Installation and Commissioning of all Architectural, HVAC, Electrical and Process utilities, to produce a highly sophisticated facility which includes sterile accommodation together with associated Clean and Technical spaces.
We identify, design and manage all Temporary Works as an integral part of our construction process in accordance with BS5975. All of our Site Supervisors and Construction Managers have undergone a rigorous training programme and have been independently certified to fulfill the role of Temporary Works Coordinators.