Working with the end users we designed and delivered this new highly specified facility on a brownfield site. The new building is set out on 2 levels and consists of ISO7 Grade Assembly and Packing Halls, Warehousing and Laboratories.
The client required a new 4,000m2 facility to be designed and built within a fully operational site on a very tight footprint surrounded by access roads, an open drain culvert and overhead power lines. Our solution also had to take account of the flood risk assessment which formed part of the planning application as well as the challenging ground conditions.
Our multidisciplinary team established the product, people & waste flows and adapted the shell design to facilitate efficient construction within the small footprint. As Principal Contractor we managed the works carefully without impacting Business as Usual for the Client. Due to the ground conditions the building design incorporated 260 piles in excess of 20m deep. We also carried out the full validation of the cGMP Grade C cleanrooms, through to OQ. The project was delivered on time, within budget and met all client expectations.